TWO DECADES OF CLOG-FREE PUMPING
PSI CASE STUDY:
Two Decades of Clog-Free Pumping
The Borough of Fair Lawn, New Jersey generates between 3.5 and 4 million gallons per day (MGD) of wastewater. The sewer system’s 550,000 linear feet of pipe often ends up carrying its share of modern trash. Fair Lawn’s main challenge is to keep the wastewater moving in the most efficient manner. PSI Process recommended the installation of Flygt N-Technology Wastewater pumps. This case study shows their impact after more than two decades of continuous operation.